Laserfiche WebLink
PRESSUF <br />1/4--18IN _ <br />3.50 " <br />(8.89 cm) <br />1/2 —14 NPT <br />INSTALLATION INSTRUCTIONS <br />18 AWG LEADS BLUE <br />BROWN <br />RED" <br />NNECTION <br />GREEN <br />Install leak sensor pressure port in product line tee -fitting at turbine <br />outlet. Install conduit with union and junction box. Connect blue and <br />brown leads to wires from terminals 5 and 6 of product line terminal <br />strip. Connect green lead to earth ground. <br />"Red lead is not used and must be properly capped off. <br />13 <br />PRODUCT LINE @I I <br />RONAN <br />LEAK SENSOR DRAWING NO. REV. <br />MODEL JT -1 <br />< X76C34 0 <br />