My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:11:36 PM
Creation date
6/23/2020 6:47:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN PROCEDURES <br />FOR MONITORING <br />NOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTE <br />Quik Stop Market #138 <br />1153 Lincoln Blvd. <br />Tracy, California 95376 <br />The gasoline storage and dispensing system at this location consists of two (2) 10,000 -gallon and <br />one (1) 8,000 -gallon double-wall fiberglass, dry -interstitial, underground storage tanks serving <br />two (2) double -sided multi -product dispensers (MPDs). Product lines are double-wall fiberglass. <br />A. Each tank and product line is monitored continuously by probes within the tank annular <br />space and turbine sump, respectively. Float and chain assemblies in dispenser pans will <br />trip shear valves in the event that dispensers leak. <br />B. The Gilbarco EMC Tank and Line Monitoring System is manufactured by Veeder-Root. <br />Leak conditions trigger visual and audible alarms located on the monitoring system <br />control panel. Turbine shutdown will occur if either power is lost to the control <br />panel or sump probes sense line leak conditions. <br />C. The monitor control panel is located in the market office. The monitor is placed in test <br />mode daily to check alarm function. Results are recorded on a "Daily Monitoring System <br />Inspection Log". <br />D. Monitoring is the responsibility of Pargat & Jaswinder Litt, Franchisees, or their <br />designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br />Quik Stop Markets, Inc. Mike Karvelot, Director of Environmental Affairs, will <br />authorize all repairs. <br />E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br />Department, which will in turn dispatch a qualified service contractor to the site. The <br />service contractor will determine the cause of alarm and advise Quik Stop of site <br />conditions. If an unauthorized release to secondary containment has occurred, action will <br />be immediately taken to implement the Simplified Response Plan. <br />F. The monitor panel and probes are checked and certified annually in August. Preventive <br />maintenance and spill bucket is scheduled annually in conjunction with monitor certification. <br />SB -989 testing is conducted triennually in December ('04, '07, ad infinitum). <br />G. A description of the gasoline system operation and operator's responsibilities are included <br />in the Franchise Agreement. Initial training in operation of the tank system and <br />monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br />personnel and the Designated UST Operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.