Laserfiche WebLink
In addition to the submersible pump problems encountered without an in-line check valve, <br />the metering portion of the leak detector is hammered by hydraulic shock. This results in <br />many leaks going undetected. Those leak detectors are -just not equiped for the job you <br />purchased them for. - <br />The 99. LD -2000 is the_answer-youu have been looking for. VMI leak detectors, with an inte- <br />grated check valve_and pressure__ reCieva[ve;:_wi save money and reduce customerfrustra- <br />tion at the dispenser and reduce service calls._ <br />The 99 LD -2000 <br />Has A Higher Level Of Performance Over Abroader Range of Burial Depth, Line Length, <br />And Piping System_Types Than Any Other Leak -Detector <br />Additional Features <br />• Over 20% increased flow capacity _ <br />• Guaranteed' for 24 months from date of installation to detect 3 GPH @10 PSI leak <br />• One Way Poppetftow <br />• Reverse Ratio Piston / Poppet combination ' <br />• Smaller Volume Faster Response piston --size <br />• Shortest profile leak detector available for"tight" installations <br />• All fuels_(_gasaline-_diesel -,_alcohol,):_ <br />• All pipelines_ lexible -. fiberglass -steel) up to 400 ml. resiliency <br />• Exceeds EPA regulations (3 GPH @ 10 PSI) <br />• Detects leaks up to 10' above the leak detector <br />• Installs with 2 1/16" six point socket or pipe wrench <br />Increased Flow Capacity <br />• The 99 LD -2000 .has maximized the flow and flow path in existing, older submersible pump <br />heads. This new design allows over 20% more flow than previous LD -2000 models, maximiz- <br />ing pump performance for earlier pump heads. <br />Longest Guarantee <br />• The 99 -LD -2000 shares the longest guarantee available in the industry, along with all other <br />VMI 99 LD -2000 series leak detectors. For 24 months from date of installation, the LD -2000 is <br />guaranteed to see a-3--GPH -leak @_ 0_ PS1 - - - <br />One Way Poppet- Flow Path <br />• The One Way Poppet Flow Path isolates pump turbulence from line leak detection at pump <br />thermal conditions encountered during station operation (precision metering change is <br />insignificant down to -20° F) <br />"Patent pending <br />