Laserfiche WebLink
Garrett Backus [EH] <br /> From: Batra, Roger <roger.batra@quikstop.com> <br /> Sent: Tuesday, August 30, 2016 3:41 PM <br /> To: Garrett Backus [EH] <br /> Subject: RE: QS# 138 (1153 Lincoln Blvd., Tracy, CA 95376) UST Program Inspection Report dated <br /> August 16, 2016 <br /> Garrett, <br /> Correct date is August 19, 2015 for the MSC test results. <br /> Thanks, <br /> Roger Batra <br /> 510-445-2285 Direct <br /> From: Garrett Backus [EH] [mailto:gbackus(absjcehd.com] <br /> Sent: Tuesday, August 30, 2016 3:38 PM <br /> To: Batra, Roger <br /> Subject: RE: QS# 138 (1153 Lincoln Blvd., Tracy, CA 95376) UST Program Inspection Report dated August 16, 2016 <br /> Roger, <br /> Please revise the underlined bolded section below and resend to me. <br /> Thank you, <br /> Garrett <br /> From: Batra, Roger [mailto:roger.batra(-@quikstop.com] <br /> Sent: Tuesday, August 30, 2016 3:07 PM <br /> To: Garrett Backus [EH] <br /> Cc: Alkoussa, Sam; Markovich, Debbie; Bosano, Cesar; Baranbo, Sam; Riggs, Nancy; Veronica Freitas <br /> Subject: QS# 138 (1153 Lincoln Blvd., Tracy, CA 95376) UST Program Inspection Report dated August 16, 2016 <br /> Garrett, <br /> In response to the subject inspection report dated August 16,2016,the following actions were/are being taken: <br /> Item 201: The work order from the August 31, 2015 fuel alarm was resolved by Elite IV Contractors (see attached). <br /> Item 203: The June 28, 2016 secondary containment test results and the August 19,2015 have been sent to the site and <br /> can be found in Tab 4 and Tab 5 of the Blue Volume I Binder, respectively. <br /> Item209: The Designated Operator(Walton Engineering) has been instructed to ensure that during the monthly <br /> inspections all of the required information is recorder on the reports.Walton Engineering has been copied on this email. <br /> Item 306: Corrected at the time of inspection. <br /> Item 308: Corrected at the time of inspection. <br /> 1 <br />