Laserfiche WebLink
10/26/2017 <br />Sniplmage.JPG 16 <br />The following is an itemized list of underground storage tank violations that have not <br />been addressed for QUIK STOP MARKET #3138 as of October 20, 2017. <br />pb—at Open violations from August 09, 2017 Inspection tk-P-YQ aT+&k <br />Violation #108 - Failed to notify the EHD 48 hours prior to conducting testing. <br />A cold start was performed on April 24, 2017 and notification was not provided to the EHD. Emergency repairs <br />relating to UST system monitoring and release detection may be performed by a properly licensed, trained, and <br />certified contractor pursuant to the EHUS policy and a permit obtained within one business day from the EHD. All <br />other repairs must have a permit submitted to and approved by the EHD prior to beginning work. Immediately <br />obtain a permit from the EHD for the cold start. A "Failure to Obtain a Permit' penalty applies. <br />C� R <br />.# v <br />�1 <br />OCI 3 0 2017 <br />U� I t,' <br />0 <br />ENVIRONMENTAL HEZALTH <br />DE- PA R T M E N <br />mi <br />�' <br />httpsi//mail.google.com/mail/u/O/#inbox/l 5f5a5el 1 efa52d3?projector=1 <br />