My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:59:10 PM
Creation date
6/23/2020 6:47:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3725\PR0231417\ENFORCEMENT\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN--PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) — <br /> BUSINESS NAME(Same as FACILITY NAME) R02. <br /> Tracy Blvd Shell <br /> BUSINESS SITE ADDRESS R03. I CITY R04. <br /> 3725 N.Tracy Boulevard Trac <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> A Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste,will be stored in a property labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material,If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment, <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment, <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. Rxo. Rao. <br /> Rl 1. R21, R31. <br /> R12. R22, R32. <br /> R13. R23. R33. <br /> R14. <br /> R24. R34. <br /> RI5. R2S. R3 S. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Roo. TITLE R50. <br /> Mo' an Manvari Area Manager <br /> NAME R41• TITLE R51. <br /> Grant Zech Operations Manager <br /> NAME R42 TITLE Rs2. <br /> Summer Ireife' En ineer <br /> R43. TITLE R53. <br /> NAME <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection ®Inspection by qualified persons ❑Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan(3/2008)3/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.