My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:59:10 PM
Creation date
6/23/2020 6:47:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3725\PR0231417\ENFORCEMENT\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-Page 2 of 3 <br /> Site Address, 3725 N.Tracy Blvd. Date of Testing/Servicing: 12/5/11 <br /> D. Results of Testing i Servicing <br /> Software Version Installed, 2.0 <br /> Complete the following checklist: <br /> N Yes 0 No* Is the audible alarm operational? <br /> N Yes 0 No* Is the visual alarm operational? <br /> 19 Yes 0 No* Were all sensors visually inspected, functionally tested,and confirmed oeerational? <br /> 0 Yes 0 No* Were all sensors installed at lowest point of secondary containment and positionedso that other equipment will <br /> not interfere with their proper operation? <br /> 0 Yes 0 No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> N N/A operational? <br /> 0 Yes 0 No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> H N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive sbut-down? (Check all that apply) 0 SumprFrencb Sensors; 0 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 0 Yes 0 No <br /> 0 Yes El No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> 0 N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and 22erating properly? If so,at what percent of tank capaci!X does the alarm trigger? 0 % <br /> [I Yes* to No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> 0 Yes* 0 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 0 Product;1:1 Water, If yes,describe causes in Section E,below. <br /> IR Yes 0 No* Was monitoring system set-H reviewed to ensure roper settings? (Attach set-up reports, il'qeelicable. <br /> L 0 Yes 0 No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Tested as part of a Permit Final for replacement of 522T Interface Board on a prior date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.