Laserfiche WebLink
5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone <br /> Address city Zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how ri!!material will be stored onsite prior to manifesting oftfte/. <br /> e. Rinnate Hauler and ApermTreatment, Storage&Disposal Facil <br /> P� a <br /> 'am <br /> Hauler Name _Phone Hauler Reg# <br /> Address city Zip <br /> Permitted Disposal Site <br /> 6. a. Describe the method that will be utilizedto u eancV;/hert the piping: <br /> b. Piping Hauler <br /> Name Phone <br /> Address city Zip <br /> Hauler Registration#(if hauled ash ous) <br /> c. Piping Disposal Site: <br /> Name Phone I <br /> Address fty zip <br /> EPA ID#(if transported to a itted TSD facility) <br /> 7. Is the sampling firm an i nt third party from the contractor? YES NO <br /> a. Identify sampling firm: <br /> Name Ph <br /> Phone <br /> y <br /> r.) <br /> 74 e L--J- <br /> Z <br /> I to a <br /> wy Intm contracto N. ES JIM <br /> Y <br /> Ph <br /> Address city Zip_ <br /> b. Identify laboratory orming analysis: <br /> Name Phone <br /> C'ty Zip <br /> Address <br /> 8. Describe,in detail,how the soil andfor water sample(s)beneath the piping or dispenser will be obtained: <br /> 9. a. Hand"of excavated soil(Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone <br /> Address city Tip <br /> b. If sod is not to be hauled,describe what will be done with it: <br /> 4 <br />