My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:59:10 PM
Creation date
6/23/2020 6:47:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3725\PR0231417\ENFORCEMENT\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN-16-2010 09:09 Service Station Systems 408 938 8888 P.05 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By. [I Piping Manufacturer 0 Industry Standard Ij Professional Engineer <br /> Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum p Hydrostatic <br /> [3 Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> lig <br /> �N= Piping Run N 87 Piping Run;4 89 Piping Run N 91 Piping Run#Diesel <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: Y 3" Y <br /> Length of Piping Run: 100, too, 100, loo, <br /> Product Stored: Gasoline Gasoline Gasoline Diesel <br /> Method and location of Reducer boots/fittings Reducer boots/fittings Reducer boots/fittings Reducer boots/fittings <br /> piping-run isolation. <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 9:00 am 9-.00 am 9;00 am 9:00 am <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 10:00 am 10:00 am 10:00 am 10:00 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: I hour I hour I hour I hour <br /> Change in Reading(11p-111): None None None None <br /> I Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss No detectable loss <br /> I Criteria: I <br /> Test Result: 0 Pas 0 Fall Fmi Pass 0 Fail 0 Pass 0 Fail M Pan 0-Fail <br /> Comments—(include information on repairs made prior to lestin ,. and recommendedV.0 or ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.