Laserfiche WebLink
utN O <br />?•''�E''•p SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />4��FOtR� <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />-1401 1")w <br />. 'v <br />Facility Addr s: <br />Service Request #: <br />? N114 <br />D <br />site Service Tec n'c an's Nam <br />ICC Service T ician/Installer xp. Date: <br />Manufacturer Training: <br />�Ww 1 <br />� 5 x 00' 4 < < <br />Vl <br />O <br />SERVICE <br />Leak detector <br />��� <br />❑ <br />❑ mechanical Model:ON <br />electronic Serial # <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />I Rece' d B: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />n <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />HIS F,ACIllrIPY ISS JECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE. <br />❑ Caldwell System ❑ Other <br />I Rece' d B: <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />r Ll� <br />EHD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />HIS F,ACIllrIPY ISS JECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE. <br />E D n tor:j'4L��' <br />I Rece' d B: <br />Title�- <br />�^� <br />r Ll� <br />EHD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />