My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:59:10 PM
Creation date
6/23/2020 6:47:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3725\PR0231417\ENFORCEMENT\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 R <br />• Dispenser -based disabling prevents <br />the entire site from shutting down in <br />the event of an EVR failure. <br />• Wired -less Flow Meter and Pressure <br />Sensor interface option when <br />conduit is not present. <br />• Ethernet -ready, web -based remote <br />access provides the user with <br />remote access to VRM status <br />Information, reports and alarm <br />Information using any web browser. <br />• Create custom rules to send a -malls <br />and text messages on alarms and <br />events directly from the_console.to <br />service and compliance personnel. <br />• User-friendly touch screen interface <br />with :1con based navigation. <br />• Scalable open architecture for easy <br />and cost-saving future upgrades. <br />TS -DT- .0 <br />11 <br />.•71*wlffw� <br />The INCON vapor recovery monitoring (VRM) option meets or exceeds all ISD <br />requirements for ensuring that all components of the vapor recovery system are functioning <br />normally. Recorded sales transactions are compared to data obtained from a TS-VFM vapor <br />flow meter installed in each dispenser to verify that equivalent vapors are recovered from the <br />vehicle when fuel is dispensed. The pressure of the vapor containment space Is constantly <br />monitored by the TS -VPS vapor pressure sensor and tested for over pressure and leakage <br />conditions. Local and remote notification options alert the user of abnormalities and <br />dispenser -based disabling keeps the rest of the site up and running when a single dispenser <br />EVR system has a problem.TS-DTU wired -less technology prevents the need to break <br />concrete to install new conduit or even pull wires. <br />TS -5000 <br />TS -550 <br />TS -EMS <br />• .Uses dispenser power wires to -_ <br />transmit data <br />• Muld-industry proven.power.line <br />communications technology. <br />• Save. weeks of instailadon time. T <br />• Save thousands of dollars in costly <br />conduit installation and avoid <br />damaged and blocked conduit = -- <br />• No disruption of forecourt by having Vapor Flow Meter Vapor Pressure Sensor Data Transfer Unit <br />to break concrete. <br />• No need to pull wires. _ <br />• Will not interfere with dispenser <br />operation. t' TS-VFM Vapor flow meter, one per dispenser _ $1,200.00 <br />SVf+>x ?resur+ie p� 93 8si <br />• UL approved for Installation in most — TS-VRM Vapor recovery monitoring software y $3,600.W <br />commondispenser models. - - - <br />pence ,.. , •- , <br />_.., <br />:Y�: ei'S3L--._�-- D#ii"5�i. f®runitforw�r�l ". <br />;.v...-::�-_:�� :tiiid_ t;�tunfeptipn�`��-� <br />• Works even If some dispensers are TS-DRK Dispenser retrofit install kit for TS-DTU/P $100.00 <br />on different phases Notes: 1. Approved by California Air Resources Board EO VR -202. <br />2 Minimum module requirements include one TS -PPA TS -ACI, TS -42018. TS-RLY or TS-10ARLY. <br />3. TS-VRM software is included In theTS-EMS console. <br />4. Order one TS-DTUIP and one TS-DRK install kit per dispenser. Order one additional TS-DTU1P <br />�.z_� for the console. Control Module software 4.5 or greater required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.