Laserfiche WebLink
Work Order: 2263381 <br />(ESO) & (ESV) Testing Form - Vcminn t- 2/1/2009 <br />l r <br />MTKU C1i' <br />U <br />Emergency Shut Off (ESO) Testing Results <br />On 2.2.- 05 in accordance with "ESO Vendor Letter (3-21-05).dod°, from Retail Compliance <br />Department as a part of annual compliance testing, this representative tested the Emergency Shut Off <br />(ESO) switches indicated on this sketch. Findines listed below: <br />Emergency Shut Off (ESO)If <br />No, Provide <br />No, Provide <br />Operational? N <br />Maintenance Log # <br />.04LIf <br />Date Called : <br />On 2.2.091 in accordance with NFPA 30A this representative tested the automatic -closing feature <br />of the Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base of each <br />individual island type dispenser indicated on the diagram below. Each device (#) ZD in all, <br />would automatically close. Findingslisted below: <br />Disp. Emergency Shut Off <br />No, Provide <br />Valve (ESV) Ope ?IMN <br />.04LIf <br />I Maintenance Log # <br />Date Called <br />Site Map Of Locatic a and Kwemnt of Devices Tested: <br />449:3,`1 3 � ► <br />t2W++ tvi 5 Zf 7 <br />ns� F V U c� <br />Tanknology Inc. 8501 N. MoPac Expressway, Suite 400, Austin, Texas 78759 <br />