Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($) <br /> $.,�)�'ACILITY'INFOIZMATION ; ,; <br /> FACILITY ID#(Agency Use Only) - I ` <br /> BUSINESS NAME(Same as FACILITY NAME) Shell&Mini Mart # 136186 3. <br /> BUSINESS SITE ADDRESS 3725 N.Tracy Boulevard 103. CITY Tracy 104. <br /> 777 <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> - _ _ - --- - -__ -- - -- ____ - - ---3a <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY El99.OTHER S eci 490-3a <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ®2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634 4904 <br /> IVB <br /> '00 <br /> 1. <br /> T .FZ3LLOWIIG,ME7' ,D(S II ,ix.t,7 Fl�ii',;'III,i i.,l, <br /> ��.. k <br /> ® 1.}CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY_ _______________________________-____-_______________________-_---_____-CONTAINMENT IS: Ela.DRY ® b.LIQUID FILLED El c.PRESSURIZED F-1-d.-_UNDER-VACUUM 490-6 <br /> __________________-_______--_____ ________________-_____-___________ <br /> PANEL MANUFACTURER: Veeder Root a9°-7. i MODEL#: TLS-3508------------- 4948 <br /> ----------------------------------------------------------------------------------------------------------------------- MODEL#: <br /> LEAK SENSOR MANUFACTURER: Veeder Root ago-9. MODEL#(S): 794380-301 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> ------------------------------_____--________---------------------------------------------------------------------------- - --------------------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): a901s <br /> ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ C.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------18 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER490-18 <br /> g•P• g•P• (Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS El b.60 HOURS <br /> 490-21 <br /> go zz <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci 490-z4 <br /> TEST FRE <br /> Q (Specify): 490-25 <br /> ®99.OTHER (Specify): SimpliCity 490-26 <br /> 490.27 <br /> .,,. Q. ,'f FttLT.(} ICN{3r METH( 5}(Clk all t�' I; Pply} <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND ago-ia <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> ------------ - - -- - - -- - -- -_ -----• - -- - <br /> 490-30 490-31 <br /> -PANEL MANUFACTURER: Veeder Root MODEL#: TLS-350R <br /> 490-32 490-33 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 1 MODEL#(S)_ 794380-208 <br /> 490-34 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> - PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636) 490-36 <br /> MLLD MANUFACTURER(S): ago-37 MODEL#(S): 490-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> 49040. 490-41 <br /> E[[6-Ki ACTURERS) Veeder Root 1; MODEL#(S): 8484 <br /> -------------------------- <br /> - <br /> ----------------------------------------------------- ---- - ------------------------------------------ -- - <br /> ------- --------------------------------------------------- -- <br /> PROGRAMMED IN LINE LEAK TEST: []--I-.-MINIMUM-MONTHLY MINIMUM-MONTHLY 0.2 g.p.h.--------❑----2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 a.YES ❑b.NO 49043 <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046 49047 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> *Allowed for monitoring of unburied emergency enerator fuel piping only per HSC§25281.5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490.52 <br /> 490-53 <br /> UPCF.UST-D(12/2007)1/5 <br />