Laserfiche WebLink
AL <br /> UNIFIED PROGRAM CONSOLIDATED FORMMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> 490-54b <br /> 91 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ^❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: Beaudreau – — aso ss D L#: TLS-350R 490-56. <br /> LEAK SENSOR MANUFACTURER: Beaudreau – 457 MODEL#(S):406/508 –�– 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES 0 b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES Z)b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS Ox I.SINGLE-WALLED ❑ 2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ 1.LIQUID ❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS [Ella.YES ❑b.NO 49044b <br /> rX, <br /> yIIIiT1��DIG=SYSTEM<,�'E$TING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECjIQULE=L=D=j MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644 <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 49o-68a ❑Visual Inspection Records 490.68b ❑Tank integrity testing results 49o-6go <br /> ❑SIR testing results(and supporting documentation records). 49MSd ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> ®Equipment maintenance and calibration records. 49mgh <br /> �7�N °e, r`, a s E.7 , e• �� <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49o-70 <br /> VIEN -S/Mm- ONA <br /> Fill Sump Sensors:Veeder Root 794380-208 S7 <br /> pages w�additionalqlinformation <br /> 7u 14e Sw Wjoe. hAvCmonitoring <br /> -6s".zed en orsttached to <br /> Provide additional comments here or indicate how this plan.490-n <br /> Overfill Protection:DropTube Fla er 1SL ,f 89 T4r6ft Su S Havt tog SNIXor! <br /> , PERS NNEL'RESPO <br /> . NSIBILITIES `.. <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Javier Arellano 490-72 TITLE MANAGER 490-73 <br /> NAME Steve Darretta 490-74 TITLE General Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> CER I ON:I certify that t4e info tigh provided herein is true and accurate to the best of my knowledge. <br /> LICA GNATU 490-76 DATE: 49°77 <br /> January 5,2010 <br /> v f <br /> APPLIC T NAME(print 490-78APPLICANT TITLE: 490-79 <br /> Aura Sibley for Shell it ducts HS&E Compliance Coordinator <br /> UPCF UST-D(12/2007)2/5 <br /> I <br />