Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> BUSINESS NAME(Same as FACILITY NAME) Tracy Blvd Shell 3_ <br /> BUSINESS SITE ADDRESS 3725 N.Tracy Boulevard 103. CITY Tracy 104" <br /> U.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR X2632,2634L 26383 2641)__ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY F-199.OTHER(Specify): 490-3 <br /> S eci 490-3b <br /> b <br /> III.MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING'IS PERFORMED USING THE FOLLOWING:METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM <br /> ---------------49D-6 <br /> -__ <br /> PANEL MANUFACTURER_-- Veeder Root MODEL#: TLS-350R <br /> 4904. 4945 <br /> ---- -- -- - - - .......-------------------- _ _ -... -_ -- - - <br /> ------------ <br /> LEAK SENSOR MANUFACTURER: Vecdcr Root 4"0-9. MODEL#(S): 794380-301 490.10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490.12. MODEL#: 490.13 <br /> -----_--------------- ------- <br /> --- ----------- ------------------- ------------------------------- ----- <br /> IN-TANK PROBE MANUFACTURER: 490"14 MODEL#(S): 49-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49046 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17 <br /> --- --- -- -- - - --- - - - - --- - ------------------------------------ <br /> -- <br /> __ <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): 490-18 <br /> g.p. g.p.h, ( P y)' 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS [Ib.60 I IOURS 490.22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: E] a.ANNUALLY El b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490.26 <br /> ®99,OTHER (Specify): SirrtpliCitY 490.27 <br /> V.PIPE MONITORING IS PERFORMED-USING THE FOLLOWING METHOD(S),(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> ----------__..-__�_T_ ------ ___..__--_-_---______ ___-------- <br /> A90.30 490.31 <br /> - <br /> -PANEL MANUFACTURER: - - Veeder Root-� _ -- ___-__- _ _ ___MODEL#_ TLS-3508 <br /> ..... <br /> -490 32 490.73 <br /> _ LEAK SENSOR MANUFACTURER: Veeder Root �- _ �- MODEL#(S): 7943800208 - <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED)A23 CCR_1263 -� 49D.36 <br /> MLLD MANUFACTURER(S): 49°37 MODEL#(S): 490-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> -_- - - -_ _ - _--------------- - - _9- <br /> _ 490A0. 490-41 <br /> - ELLD MANUFACTURERS) Veeder Root- - _- - - - _ MODEL#(S)_ PLLD <br /> -_ _ - - <br /> PROGRAMMED IN LM LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49-44 <br /> 4,PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904649047 <br /> 5.VISUAL PIPE MONITORING. 490"48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490.49 <br /> •Aaowed for monitoring ofunburied emergency enerator Poet piping only per HSC 25281.5 <br /> ❑ 6,SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(x)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490.52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> UST Response Plan(3/2008)3/3 <br />