Laserfiche WebLink
8. <br />12-10-1998 PP 1 Flo • <br />a. /Describe the method that will be utilized W purge andlor in rt the taak(s): <br />—776 G <br />b. TaakOptng Hauler <br />Name__ <br />Address/373 f`�dE✓z �9�/� CityTA•,�.¢ <br />Phone Nol :741 -) <br />Zip 9Z 33 7 <br />Hauler Registration # Of hauled as hazardous)_ /�y� 34 O/G 2-4Z7. - -- <br />c. TaniMpiug Disposal Site: <br />Name �aI-oQ,V �o r I �,w-o <br />Address 13 7 3 47fe" - A zpz- — aty Z� r -A -,/,+ Zip- 29 <br />Pbone Ho42d 2 ) 3-5s-- 5-z:o f <br />EPA IN (if transported to a permitted TSD facility) <br />S. Is the sampling firm as independent third party from the contractor? YES No i I <br />sa. Describe. in detail, how the soil audlor water sample(s) beneath the tank and piping will be obtained: <br />10. Describe how the excavation will be backtilled with suitable material upon removal: <br />il. Handling of excavated sots: <br />a) What material will be used to cine the tank pit and cover the stockpile? <br />7-7C— <br />/b) What will be the final destination of the excavated stockpile? <br />C) Contaminated Soll Hazardous Waste Hauler. <br />f <br />Name Z-0 oz -o cg�_ ��✓� Hauler Registration <br />Address 12731- ,-r/ ell AZrC, ciiy am, zlp 3� <br />Phone No.-- <br />sa 91 CIA9 IU -i -i IAIIQIQSZI DAR& Z <br />G. S <br />