My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:58:10 PM
Creation date
6/23/2020 6:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:7 <br />April 13, 1993 <br />BACKGROUND <br />PROPOSED WORKPLAN <br />CONTEL <br />430 W. Center St. <br />Manteca, CA <br />• <br />In 1989, Groundwater Resources, Inc. (now RESNA Industries) <br />determined that the 3,000 gallon underground tank at this location <br />was double walled and of steel construction. It was determined <br />that the best method of monitoring this tank was by in -tank <br />monitor, Tidel GTM-1, which primary was used for inventory control. <br />The attached drawing indicates the location of the tank and the <br />original Tidel console. <br />PROJECT <br />Due to changes in the underground tank regulations, an upgraded <br />version of the Tidel GTM-1 must be installed to meet current <br />compliance requirements. RESNA proposes to remove and install a <br />new updated in -tank probe in the 3,000 gallon diesel tank using the <br />same tank opening and accessories as the existing probe for the <br />GTM-1. This probe, Part No. 401-009-001 will be installed in the <br />field, connected to Part No. 301-0327-001 liquid sensor which is to <br />be placed in the annular space of the double walled tank and using <br />the existing conduit lines the control wires will be pulled through <br />to the interior of the building and connected to a new Tidel EMS - <br />3000 Console which will replace the existing GTM-1 console. <br />The entire project should take a maximum of two to complete <br />including set-up and calibration of the new equipment by factory <br />trained RESNA personnel. Contel site staff electricians will <br />verify all connections. <br />This project wi�l require a minimum of site activity, additional <br />cost to CONTEL and provide a current method of full in -tank <br />monitoring utilizing the latest technology meeting all EPA <br />specifications. <br />TECHNICAL DATA <br />Enclosed you will find the appropriate technical support data for <br />the Tidel EMS -3000 unit. The unit will be observed each day by <br />CONTEL personnel on site to assure regular operating procedures. <br />RESNA will provide on site operator training for Contel personnel <br />and will be readily available for troubleshooting on an as needed <br />basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.