My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:58:10 PM
Creation date
6/23/2020 6:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L-1 <br />Pi <br />A <br />_, .— <br />kJ <br />S%_ �"�� •� ! ' i� o� ��0 8� <br />Name of Supplier. Owner or Dealer Address No. and Streets) City State Dale of Test <br />15. TANK TO TEST <br />el � <br />Identity by position <br />farandand Grade' <br />17. FILL -UP FOR TEST <br />Stick Water Bottom—� <br />before Fill -up <br />to '/a in. <br />16. CAPACITY <br />Nominal Capacity 3, ®)Oe`% <br />Gallons <br />Is there doubt as to True Capacity? El <br />See Section "DETERMINING TANK CAPACITY" <br />Gallons <br />Fill up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />Inventory <br />Stick Readings <br />to Ys in. <br />Gallons <br />Total Gallons <br />ea. Reading <br />1,�.— <br />Tank Diameter f� Product in full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANKI+PZ: &P_.&t/r a-® y7rYjF �O <br />See manual sections applicable. Check below and record procedure in log (26). <br />[� -- <br />Water in tank � High water table in tank excavation D Line(s) being tested with LVLLT <br />19. TANK MEASUREMENTS FOR <br />From <br />TSTT ASSEMBLY <br />34' <br />Station Chart <br />most accurate <br />ca <br />capacity chart available <br />Tank Manufactures s Chart <br />Gallons <br />(J <br />Company Engineering Data <br />is <br />20. EXTENSION HOSE SETTING <br />Tank top to grade' ............... <br />Charts supplied with PPfrOjlfP <br />Extend hose on suction tube 6" or more <br />L <br />Other <br />CHANGE <br />Fill up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />Inventory <br />Stick Readings <br />to Ys in. <br />Gallons <br />Total Gallons <br />ea. Reading <br />1,�.— <br />Tank Diameter f� Product in full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANKI+PZ: &P_.&t/r a-® y7rYjF �O <br />See manual sections applicable. Check below and record procedure in log (26). <br />[� -- <br />Water in tank � High water table in tank excavation D Line(s) being tested with LVLLT <br />19. TANK MEASUREMENTS FOR <br />3O. HYDROSTATIC <br />TSTT ASSEMBLY <br />34' <br />Bottom of tank to Grade* .................... <br />/ l� <br />Add 30" for 4" L ................. <br />�® " <br />Add 24" for 3" L or air seat ....... <br />TEMPERATURE COMPENSATION <br />Total tubing to assemble Approximate <br />is <br />20. EXTENSION HOSE SETTING <br />Tank top to grade' ............... <br />CONTROL <br />Extend hose on suction tube 6" or more <br />USE FACTOR (a) <br />below tank top <br />CHANGE <br />'If Fill pipe extends above grade, use top of fill. <br />28. <br />VAPOR RECOVERY SYSTEM <br />L_) Stage I <br />[—] Stage II <br />21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br />Is ToCay V.armeO . , Colded _° F ProCuU in Ta7,k __` F Fill --up Product on Truck _` F Expec,eC Cba-,e (- or ) <br />22. Thermal -Sensor reading after circulation_Zx�&.7�8 16'/ -F <br />d-g,ts Nearest <br />23. Digits per °F in range of expected change <br />0 g4 <br />24. �Rf ( X , (0 `-) = / :5 !1:. gallons <br />total quantity in coefficient of expansion for volume change in this tank <br />full tank (16 or 17) involved product per 'F C OO,q/ <br />25. /. 3a;�_ _ 3Z?lI = ,00J///OCI0 This is <br />volume change per `F (24) Digits per `F in test Volume change per digit. test <br />Range (23) Compute to 4 decimal p=laces. factor (a) <br />26. <br />3O. HYDROSTATIC <br />31. <br />34' <br />NET VOLUME <br />39 <br />LOG OF TEST PROCEDURES <br />PRESSURE <br />I <br />VOLUME MEASUREMENTS (Y) <br />TEMPERATURE COMPENSATION <br />(38• <br />CHANGES <br />ACCUMULATED <br />CONTROL <br />RECORD TO .001 GAL.11 <br />USE FACTOR (a) <br />EACH flEA01NCa <br />CHANGE <br />27. <br />28. <br />29. <br />Standpipe Level <br />32. Product in Product <br />35. <br />36. <br />37. <br />Temperature <br />At High Level record <br />DATE <br />Record details -of settin U <br />Reading <br />in Inches <br />Graduate Replaced (—i <br />I <br />Chane <br />g <br />Computation <br />D <br />Total End Deflection <br />and funning test (Use full <br />length of line if needed.) <br />No. <br />Thermal <br />Sensor <br />Higher + <br />Lower — <br />(c) x (a) = <br />Espansion + <br />Beginning Level to <br />olumem int <br />Volume Minus <br />( • i � <br />At Low Level compute <br />11wE <br />of which <br />Before <br />Alter Product <br />Readm g <br />( 0 <br />Contraction — <br />i <br />Contraction <br />ContradrOn (—) <br />Chante per Hour <br />(74 hr,) <br />Reading Restored <br />Reading <br />Reading Recovered (+) <br />#33M— p 37(T) <br />INFPA criteria) <br />
The URL can be used to link to this page
Your browser does not support the video tag.