Laserfiche WebLink
.CH. 40 P.V.C. WITH 2' <br />LEADED COUPLING <br />MON: REMOVE TANK PROBE <br />)M PIPE BEFORE CUTTING <br />E �1F LENGTH OF PIPE IS <br />EKED.) <br />SPECIFICATIONS <br />I. Standard Probe Depth - T <br />2. Doted Tis &nen of Hydrocarbons with - 0.25' (Factory Set) <br />Water in Pipe Ad)ustebls hoer yr to r <br />3. Deter! Thickness of I+Omwbom with - r <br />Dry Pipe <br />4. Operating TernpraWre Rengs - -40' C lo+50' C <br />a. The ooraeol and probe we oponde from <br />-40' C to.w C in so <br />4 With water present Me probe wit krdy <br />operate frau 11 C to +50' C <br />TANK PROBE INSTALLATION IISTRUCTIONS <br />1. The hppi�6paeO(O2Cd' 40 delledlon probe to Supplied Vdth <br />PSV C) a a 1 1/2' NPT <br />coupling. (roW IongM 36' wt be out is a niA ins vt of 2y <br />PROS <br />2. sceaw assembly (at reoeiwed) to r tank pips. <br />3. Remove Us wraps Rom stainless stoat rope. <br />4. Lowsr to full adrston of stems OW was <br />rope, Wexbvm <br />v*8 slightly to tale up do* and stags <br />ASPHALT OR <br />CONCRETE APRON <br />2' • 4' <br />MAN <br />HfOIE <br />TYPICAL GROUNDWATER PROBE <br />MANHOLE INSTALLATION <br />(Apron we suggested as <br />standard installation practice) <br />TANK PROBE INSTALLATION IISTRUCTIONS <br />1. The hppi�6paeO(O2Cd' 40 delledlon probe to Supplied Vdth <br />PSV C) a a 1 1/2' NPT <br />coupling. (roW IongM 36' wt be out is a niA ins vt of 2y <br />PROS <br />2. sceaw assembly (at reoeiwed) to r tank pips. <br />3. Remove Us wraps Rom stainless stoat rope. <br />4. Lowsr to full adrston of stems OW was <br />rope, Wexbvm <br />v*8 slightly to tale up do* and stags <br />