My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:58:10 PM
Creation date
6/23/2020 6:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data Acquisition <br />How are the test data acquired and recorded? <br />( ) manually <br />( ) by strip chart <br />(X) by computer Contained. within the EMS console <br />Procedure information <br />> Waiting times <br />What is the minimum waiting period between adding a large volume of product (i.e., a <br />delivery) and the beginning of a test (e.g., filling from 50% to 90-95% capacity)? <br />( ) no waiting period <br />(X ) less than 3 hours <br />() 3-6 hours <br />( ) 7-12 hours <br />( ) more than 12 hours <br />(X ) variable, depending on tank size, amount added, operator discretion, etc. <br />Many factors can influence test. For best results, wait 10 hours. <br />> Test duration <br />What is the minimum time for collecting data? <br />( ) less than 1 hour <br />(X) 1 hour <br />( ) 2 hours <br />( ) 3 hours <br />( ) 4 hours <br />( ) 5-10 hours <br />( ) more than 10 hours <br />(X) variable (explain) Programmable 1 to 6 hours <br />> Total time <br />What is the total time needed to test with this ATGS after a delivery? <br />(waiting time plus testing time) <br />3 hours 0 minutes (minimum) <br />16 hours 0 minutes (maximum) <br />ATGS - Description Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.