My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:58:10 PM
Creation date
6/23/2020 6:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />i <br />Criterion forecl g Leak <br />system <br />preset threshold <br />measures and reports theoutput quantity and compares it to : predetermined threshold <br />to determine whether the r rlealdng. <br />4. This r* <br />single <br />uses a ■■ • sequence rr +iwr of tests (specifynumber of <br />required) r. a by ■•(specify• rime rterval betweentests) <br />to determine whether thepipeline is leawing <br />5. This system declares a leak if the output of the measurement system exceeds a threshold of <br />3 gal/h (specify flow rate in gal/h) in 1 out of ' 1 tests (specify, for example, <br />1 out of 2, 2 out of 3). If more detail is required, please specify in the space provided. <br />r • ns a• •r r • • from <br />min to less than 15 sec. <br />Evaluation r t r <br />r There are five options fr collecting the data n evaluating the performance of r <br />system.This rr was evaluated <br />(X) at a special -. Ori•• <br />at one or moreinstrumented rr ion r .r .•e facilities (Option <br />at five or more operational str . .■. facilities verified to be tight (Option <br />at 10 or more operational st• _e tank r. (Option <br />with an experimentally validatedcomputer mire (Option <br />totalof 92 tests were conductedon nonlealdng tank(s)between •1 • <br />and 6/25/91 a_ desddptioa of a` pipeline c r a m used in the evaluation is <br />summarized in Attachment <br />8. The pipeline used in the evaluation was 2 in. in diameter, 112 ft long and <br />constructed r fiberglass or i ■ <br />9. A mechanical line leak detector <br />C1'g was <br />( ) was not <br />present in the pipeline system. <br />Answer questions / ♦ / 11 if Optionor <br />i' The evaluation was conducted on (how u.r pipeline syste■a ry ■ in <br />diameter r"irr. in. to in, ranging in length from to <br />and constructed of(specifym . <br />pipeline Leak Detectioa System • Results Form page 2 of 5 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.