Laserfiche WebLink
`ypV wC�� <br /> A ' <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B I <br /> r - o <br /> •��tooww`�• •. <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSE ON SITE <br /> ONE TEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED ©Ca G2..- <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ?'c' ''' "� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK 1.D.# B. MANUFACTURED BY: 1 <br /> C. DATE INSTALLED(MO/DAYNEAR) /�^r=C/ D. TANK CAPACITY IN GALLONS: 7) U <br /> I <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ la REGULAR UNLEADED3 DIESEL E] 6 AVIATION GAS <br /> ❑ 2 PETROLEUM E] 80 EMPTY ❑`1 PRODUCT ❑ lb PREMIUM UNLEADED 94 GASAHOL ❑ 7 METHANOL <br /> ❑ lc MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELow) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: J <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF <br /> ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER F-] 5 INTERNAL BLADDER SYSTEM ❑. 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ i BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> I <br /> i <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTICCORROSION <br /> i <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,atC. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH U UNKNOWN A U 99 OTHER ! <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE i <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑1 MECHANICAL LINE LEAK ❑2 UNE TIGHTNESS ❑3 CONTINUOUS INTERSTITIAL [D4 ELECTRONIC LINE E]5 AUTOMATIC PUMP ❑99 OTHER <br /> OETECTOR TESTING MONITORING LEAK DETECTOR SHUTOOWN <br /> V.TANK LEAK DETECTION NUALj <br /> ❑ 1 VISUAL CHECK ❑ 2 RECONCILIATIONMANUAL ORY [—] 3 MONIITORING VAOZE ❑ 4 GAUL NGAUTOMATIC TANK E]5 MON TORINGGROUND TER ❑6 TESTINGTANK <br /> 7 <br /> MONITORING INTERSTITIAL ❑ 8 SIR ❑ 9 TAENK GAUGING TESTING❑10 T STINGY TANK E] 95 UNKNOWN E]99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST UID S AY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO <br /> 1 k SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 ❑ ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 6 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D:# m - A <br /> z. <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE 1A2 Q <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORMA,UNLESS A CURRENT FORMA HAS BEEN FILED. FORM C MUST BE COMPLETED INSTALLATIONS.THIS MU <br /> SHOULD BE ACCOMPANIED BY A PLOf&. FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING IaDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />