Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YESX NO [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for <br />each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br />and Safety Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br />drawn to scale showing location of repairs and/or replacements. If repairing a component, describe how this will <br />be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br />Installation Application pages 4-8 as necessary for a timely plan review): <br />Replace existing piping vault sensor Veeder Root model number 794380-320 per manufacturers instructions. <br />Replace existing overfill alarm Veeder Root model number 790091-001 per manufacturer instructions. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Veeder Root model number 794380-320 <br />Veeder Root model number 790091-001 <br />3 <br />