Laserfiche WebLink
ROUTINE <br /> PROCEDURES <br /> Section 2632 (d)(1) Title 23 CCR, Chapter 16 <br /> UNDERGROUND FUEL STORAGE TANK <br /> Facility Name: VERIZON Manteca CO <br /> Facility Address: 460 W. Center Street <br /> Manteca, CA 95336 <br /> UST Installed: Double Wall Joor Plasteel Composite 6000 Gallons, <br /> Containing diesel fuel for an emergency generator. <br /> Piping Installed: Doubled Wall "Enviroflex" non-metallic flexible piping <br /> system for the product supply and return lines. <br /> Double Wall - Primary: Scotchkote 206N (Fletcher coat) <br /> Schedule 40 Steel for the vent line. <br /> Secondary Containment: Enviroflex for the product supply and return; <br /> Fiberglass, for the vent line. <br /> Overfill Protection: Mechanical Flapper and visual alarm at 90% full. <br /> A. The Frequency of Performing the Monitoring: <br /> Monitoring is performed continuously on the: <br /> • Double wall UST Interstitial space and its two sumps <br /> • All piping and risers below grade <br /> • Piping vault <br /> B. The methods and equipment used to perform continuous monitoring are: <br /> • Veeder-Root TLS-350 UST Monitoring System with Integral Printer <br /> • Continuous Statistical Leak Detection <br /> • Site fax modem <br />