Laserfiche WebLink
MONITORING SYSTEM CERTIFICATION <br />For Use By All Jurisdictions Within the State of California <br />Authority Cite& Chapter 6 7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared <br />for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br />system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 <br />days of test date. <br />A. General Information <br />Facility Name: VERIZON-MANTECA CO <br />Site Address: 460 W. CENTER ST. <br />Facility Contact Person: MASOOD CHOUDHURY <br />Make/Model of Monitoring System: VEEDER ROOT TLS -350 <br />Bldg. No.: <br />City: MANTECA <br />Zip: 95336 <br />Contact Phone No.: 209-239-0251 <br />Date of Testing/Servicing: September 29, 2009 <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate specific equipment inspected/serviced: <br />Tank ID: DIESEL FUEL <br />Tank ID: <br />In -Tank Gauging Probe. Model: 847390-108 <br />❑ In -Tank Gauging Probe. Model: <br />Annular Space or Vault Sensor. Model: 794380-320 <br />❑ Annular Space or Vault Sensor. Model: <br />Piping Sump / Trench Sensor(s). Model: 794380-350 <br />❑ Piping Sump / Trench Sensor(s). Model: <br />Fill Sump Sensor(s). Model: 794380-350 <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />Tank Overfill / High -Level Sensor. Model: 331196-001 <br />❑ Tank Overfill / High -Level Sensor. Model: <br />Other (specify equipment type and model in Section E on Page 2). <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Tank ID: <br />Tank ID: <br />❑ In -Tank Gauging Probe. Model: <br />❑ In -Tank Gauging Probe. Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br />correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of gpnerating such reports, I have also <br />attached a copy of the report; (check all that apply): N System set-up report; N AlarVbistory re o <br />Technician Name (print): RUDY ALMAZAN Signature: <br />Certification No.: 5256842 -UT License No.: 703190 <br />Testing Company Name: SUNWEST ENGINEERING INC. <br />Phone No.: ( 909 ) 594-9850 <br />Page 1 of 3 03/01 <br />