My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1999-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 1:10:52 PM
Creation date
6/23/2020 6:47:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2011
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1999-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MonitorhT System Certification <br />UST Monitoring Plan <br />site Address: 460 W. CENTER ST. <br />OFFICE <br />B L D 6 . FUEL POLISHER LINE <br />STIMATED LOCATION FUEL POLISHER UNE <br />STIMATED LOCATION <br /><H5uel Ppo�lis�h�e�r <br />..._..SClls9L_-____ _. _......... <br />O� RETURN LINE <br />STIMATED LOCATION <br />PRODUC LINE <br />LOCA71 <br />ESTIMATED H3:Piping Sung <br />:Piping Vault Piping Su Sana <br />Sensor <br />iD <br />DIESEL <br />TANK <br />T TANK LEVEL -R E 6000 <br />A L. H2:Fill Stihl <br />TANK VENT LINE F� <br />CATHO CSTI TED LOCATION 6 O Sensor <br />�o Da f Tank I OX G Hl Annular Space <br />DIESEL Sensor <br />ENIERATO <br />Spin <br />Monitoring System - Container <br />Control Panel <br />VEEDER ROOT TLS -350 <br />Date map was drawn: 1 0/ 0 -1 / 2 0 o a <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification. On your plan, show the general layout of the tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panel; sensor <br />monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br />mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this plan was prepared <br />
The URL can be used to link to this page
Your browser does not support the video tag.