Laserfiche WebLink
I <br />SWRCB, January 2002 <br />Test Method Developed By: <br />0 0 Page 2 of 2 <br />5. SECONDARY PIPE TESTING <br />0 Piping Manufacturer 19 Industry Standard 0 Professional Engineer <br />R Other (Specify) <br />Test Method Uses: <br />0 Pressure 0 Vacuum 0 Hydrostatic <br />13 Other (Specify) <br />Equipment Resolution:0.2 psi <br />om <br />1- m X <br />AFI "S <br />Piping Material: <br />"M 1011 AM <br />10 4 <br />Piping Manufacturer: —1: <br />Total Containment <br />Length of Piping Run: <br />MethoUanflocation of <br />piping -run isolation: <br />4" Test Doughnut <br />Wait time between applyiiM <br />pressure/vacuum/water ay, <br />starting test: <br />Test Start Time: <br />Test End Time. <br />slum, ItImt <br />all <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or Critenia" <br />Wxlil <br />C o m m en ts - (include information on repairs made prior to testing, and recommendedfollow -up for failed tests) <br />