Laserfiche WebLink
U <br />SWRCB, January 2002 <br />is Page 3 of 7 <br />Test Method Developed By: <br />5. SECONDARY PIPE TESTING <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Uses: <br />® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:O to 15 Psi Glycerin -Filled Pressure Gane Equipment Resolution: 0.2 Psi <br />Piping Material: <br />Piping Run # Sup/Ret Line(Pol) Piping Run # Sup/Ret Line(Gen) Piping Run #Supply Line(Pol) Piping Run # <br />Plastic Plastic Fiberglass <br />Piping Manufacturer: <br />Total Containment Total Containment Total Containment <br />Piping Diameter: <br />4" 4" 4" <br />Length of Piping Run: <br />42' 47' 13' <br />Product Stored: <br />Diesel Diesel Diesel <br />Method and location of <br />piping -run isolation: <br />4" Test Doughnut 4" Test Doughnut 4" Test Doughnut <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />1 hr 1 hr 1 hr. <br />Test Start Time: <br />8:05 AM 8:10 AM <br />Initial Reading (Rl): <br />5 psi. 5 psi. <br />Test End Time: <br />9:05 AM 9:10 AM <br />ding (RF): <br />5 psi. 5 psi. <br />tion: <br />1 hr. 1 hr. <br />Reading (RF-Rl): <br />L <br />0 0 <br />Threshold or Criteria: <br />0.002 0.002 <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />No Repairs Made. <br />Polisher supply and return line (share same secondary) from the piping sump to the polisher failed pressure test due to a torn <br />termination test boot located inside of polisher box. Need to replace termination boot. <br />Generator supply and return line (share same secondary) from piping sump to piping vault inside of generator room. <br />Supply line for the polisher runs from the fill sump through the piping sump. <br />Revision: <br />