My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1999-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 1:10:52 PM
Creation date
6/23/2020 6:47:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2011
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1999-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />SWRCB, January 2002 <br />is Page 3 of 7 <br />Test Method Developed By: <br />5. SECONDARY PIPE TESTING <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Uses: <br />® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:O to 15 Psi Glycerin -Filled Pressure Gane Equipment Resolution: 0.2 Psi <br />Piping Material: <br />Piping Run # Sup/Ret Line(Pol) Piping Run # Sup/Ret Line(Gen) Piping Run #Supply Line(Pol) Piping Run # <br />Plastic Plastic Fiberglass <br />Piping Manufacturer: <br />Total Containment Total Containment Total Containment <br />Piping Diameter: <br />4" 4" 4" <br />Length of Piping Run: <br />42' 47' 13' <br />Product Stored: <br />Diesel Diesel Diesel <br />Method and location of <br />piping -run isolation: <br />4" Test Doughnut 4" Test Doughnut 4" Test Doughnut <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />1 hr 1 hr 1 hr. <br />Test Start Time: <br />8:05 AM 8:10 AM <br />Initial Reading (Rl): <br />5 psi. 5 psi. <br />Test End Time: <br />9:05 AM 9:10 AM <br />ding (RF): <br />5 psi. 5 psi. <br />tion: <br />1 hr. 1 hr. <br />Reading (RF-Rl): <br />L <br />0 0 <br />Threshold or Criteria: <br />0.002 0.002 <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />No Repairs Made. <br />Polisher supply and return line (share same secondary) from the piping sump to the polisher failed pressure test due to a torn <br />termination test boot located inside of polisher box. Need to replace termination boot. <br />Generator supply and return line (share same secondary) from piping sump to piping vault inside of generator room. <br />Supply line for the polisher runs from the fill sump through the piping sump. <br />Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.