Laserfiche WebLink
ROUTINE MONITORING PROCEDURES <br /> Section 2632 (d)(1) Title 23 CCR, Chapter 16 <br /> UNDERGROUND FUEL STORAGE TANK <br /> Facility Name:Verizon Manteca Central Office <br /> Facility Address: 430 West Center Street <br /> Manteca, CA 95336 <br /> UST Installed: Double Wall Joor Plasteel Composit 6,000 Gallons Containing Diesel <br /> Fuel, for the Emergency Generator. <br /> Piping Installed: Doubled Wall "Enviroflex" non-metallic flexible piping system for <br /> the product supply and return lines and Fuel Filtration <br /> system. <br /> Double Wall - Primary: Scotchkote 206N (Fletcher coat) <br /> Schedule 40 Steel for the vent line. <br /> Secondary Containment: Enviroflex for the product supply and return; <br /> Fiberglass, for the vent line. <br /> A. The Frequency of Performing the Monitoring: <br /> Monitoring is performed continuously on the: <br /> • Double wall UST Interstitial space and its two sumps <br /> • All piping and risers below grade <br /> • Piping vault <br /> B. The methods and equipment used to perform continuous monitoring are: <br /> • Veeder-Root TLS-350 UST Monitoring System with Integral Printer <br /> • Continuous Statistical Leak Detection <br /> • Site fax modem <br /> ➢ VZ Environment Management Group 909-628-3380 <br /> ➢ VZ Generator Group 909-620-6415 <br /> SunWest Engineering Const. Inc. 562-663-1320 <br />