Laserfiche WebLink
Site Address: 430 West Center Street <br />A Results of Testing/Servicing <br />Software Version Installed: 16.05 <br />Complete the following checklist: <br />El <br />Date of Testing/Servicing: 09 / 01 / 11 <br />N Yes <br />❑ No* <br />Is the audible alarm operational? <br />• Yes <br />❑ No* <br />Is the visual alarm operational? <br />• Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />N Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />M N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ❑ Yes; ❑ No. <br />M Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />❑ N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill <br />point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? 90 % <br />❑ Yes* <br />N No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />N No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />N Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />FX Yes <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />I tested the piping vault sensor and the Fuel Polisher Sensor which are 794380-320's. <br />Page 2 of 3 03/01 <br />