Laserfiche WebLink
t <br />Monitoring System Certification <br />Site Address: 460 W. CENTER ST. <br />LJ <br />Date map was drawn: 0 910 7 2 0 7 7 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification. On your plan, show the general layout of the tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panel; sensor <br />monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br />mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this plan was prepared <br />OFFICE <br />D L D O . <br />FUEL POLISHER UNE <br />STIMATED LOCATION <br />FUEL POLISHER UNE <br />STIMATE-ON <br />HS: us[ <br />Polisher <br />0�RETURN <br />UNE <br />q_ <br />ESTIMATED LOCATON <br />Q <br />PRODUC LINE <br />"n <br />ESTIMATED LOCAMO <br />H3:Pi{zng Sump <br />H4 R Vault <br />p Sensor <br />Piping Sum <br />Senses <br />DIESEL <br />TANK <br />T TANK LEVEL PR BE <br />o o o 0 <br />TANK VEM UNE FII Sump <br />AL' <br />H2:Fill Sump <br />® <br />ESTI <br />TED LOCATION <br />O <br />Sensor <br />Do I Tank CATHO OX <br />__.._...._ <br />..._ O <br />H1:Annular Space <br />DIESEL <br />Sens. <br />ENERATO <br />Spill <br />Monitoring System <br />Container <br />Control Panel <br />VEEDER ROOT TLS -350 <br />Date map was drawn: 0 910 7 2 0 7 7 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification. On your plan, show the general layout of the tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panel; sensor <br />monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br />mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this plan was prepared <br />