My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_1999-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 1:10:52 PM
Creation date
6/23/2020 6:47:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2011
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_1999-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 9 0 <br />SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />v <br />Page 3 of 7 <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Uses: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 0 TO 15 PSI GLYCERIN FILLED PRESSURE GUAGES Equipment Resolution: 0.2"HG. <br />Piping Run # SUPPLY/RET (POL) Piping Run # SUPPLY/RET (GEN) Piping Run # SUPPLY (POL) Piping Run # <br />Piping Material: <br />PLASTIC <br />PLASTIC <br />PLASTIC <br />Piping Manufacturer: <br />TOTAL CONTAINMENT <br />TOTAL CONTAINMENT <br />TOTAL CONTAINMENT <br />Piping Diameter: <br />4" <br />4" <br />4" <br />Length of Piping Run: <br />45' <br />45' <br />8' <br />Product Stored: <br />DIESEL <br />DIESEL <br />Diesel <br />Method and location of <br />piping -run isolation: <br />4" TEST DONUT <br />4" TEST DONUT <br />4" TEST DONUT <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 MIN. <br />30 MIN. <br />30 MIN. <br />Test Start Time: <br />12:00 PM <br />12:00 PM <br />12:00 PM <br />Initial Reading (Ri): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />1:00 PM <br />1:00 PM <br />1:00 PM <br />Final Reading (Rf): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 HR. <br />1 HR. <br />1 HR. <br />Change in Reading (Rf-Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />PASS <br />PASS <br />PASS <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.