Laserfiche WebLink
4 9 0 <br />SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />v <br />Page 3 of 7 <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Uses: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 0 TO 15 PSI GLYCERIN FILLED PRESSURE GUAGES Equipment Resolution: 0.2"HG. <br />Piping Run # SUPPLY/RET (POL) Piping Run # SUPPLY/RET (GEN) Piping Run # SUPPLY (POL) Piping Run # <br />Piping Material: <br />PLASTIC <br />PLASTIC <br />PLASTIC <br />Piping Manufacturer: <br />TOTAL CONTAINMENT <br />TOTAL CONTAINMENT <br />TOTAL CONTAINMENT <br />Piping Diameter: <br />4" <br />4" <br />4" <br />Length of Piping Run: <br />45' <br />45' <br />8' <br />Product Stored: <br />DIESEL <br />DIESEL <br />Diesel <br />Method and location of <br />piping -run isolation: <br />4" TEST DONUT <br />4" TEST DONUT <br />4" TEST DONUT <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 MIN. <br />30 MIN. <br />30 MIN. <br />Test Start Time: <br />12:00 PM <br />12:00 PM <br />12:00 PM <br />Initial Reading (Ri): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />1:00 PM <br />1:00 PM <br />1:00 PM <br />Final Reading (Rf): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 HR. <br />1 HR. <br />1 HR. <br />Change in Reading (Rf-Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />PASS <br />PASS <br />PASS <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Revision: <br />