My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 12:02:20 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT 2 3 2018 V <br /> (CM-1 A PEI/RP1200-12 <br /> alarm devices must automatically restrict flow or alert 7.1.6 Inspection Procedure.ENVIRONMENTAL HE LT <br /> the transfer operator when the tank is no more. than r)FR ?TME `j' <br /> 90 percent full.This approach reflects the more conserva- <br /> 1. Remove the drop tube from the tank. <br /> (D <br /> five application of the rules. 2.Visually inspect the automatic shutoff valve and <br /> float mechanism for any damage and remove <br /> QL <br /> 7.1 Automatic Shutoff Devices. any debris or foreign objects. <br /> 7.1.1 General. Automatic shutoff devices, 3.Manually move the float mechanism to ensure it 3 <br /> sometimes called flappers or flapper valves, are moves freely. M <br /> an integral part of the drop tube assembly installed <br /> within the tai* fill riser. They are designed to 4.With the float mechanism in the shutoff'(closed} <br /> position, visually inspect the drop tube and 0 <br /> initially restrict and subsequently completely shut <br /> off flow when product has reached predetermined move <br /> that the shutoff valve is released and will <br /> move into the product flow path. Y, <br /> levels during a delivery. Automatic shutoff valves a <br /> need to be properly positioned and operate freely to S. If possible, verify that the bypass valve in the (0 <br /> 6 <br /> control flow and prevent tank overfills. drop tube is open and free of blockage. 2 <br /> C, <br /> 7.1.2 Purpose. The purpose of this inspection 6.If problems with the shutoff valve are found and <br /> M <br /> (k <br /> is to verify the automatic shutoff valve is installed defective components need repair or replace- <br /> ment,notify the appropriate person. <br /> properly, operates as desisted and is set to com- <br /> 0 <br /> pletely shut off flow when the tank is no more than 7.Using the automatic shutoff device nianufac- <br /> 95 percent full. turer's suggested procedure, examine the drop z <br /> 7.1.3 Description of Inspection. After a pre- <br /> tube and shutoff valve to determine if product 0 <br /> flow will be completely shut off at 95 percent of <br /> liminary inspection of the automatic shutoff instal- <br /> tank capacity. Make any adjustments necessary <br /> lation,the drop tube is removed from the tank, he <br /> to ensure that flow will be completely shut off <br /> automatic shutoff is checked for proper operation, <br /> when the tank is no more than 95 percent full. <br /> and its placement is measured to verify that it is <br /> 0 <br /> properly located to completely shut off flow when <br /> the tank is no more than 95 percent full. <br /> 7.1.4 Preparation. Refer to the tank manufac- <br /> 3L <br /> turer's calibration chart for the capacity in gal- <br /> Ions, the diameter and the volume of product with <br /> respect to product level. <br /> If the automatic shutoff device has a float that <br /> extends from the drop tube in the shutoff(closed) <br /> position, verify the proper orientation of the float. <br /> mechanism.The float mechanism should be orient- <br /> Cr <br /> ed away from any obstructions(ball float,submers- <br /> ible turbine pump (STP), tank- wall, tank gauge <br /> probe, etc.) If the movement of the float mecha- <br /> nism is restricted,it will not function as designed. X <br /> Use this procedure in conjunction with the manu- FIGURE 7-1. Check the drop tube and flapper for dam- <br /> facturer*s installation and maintenance instructions. age. Make sure that the flapper moves freely and shuts <br /> off flow when extended. <br /> 7.1.5 Inspection Equipment. 'Fest equipment <br /> shall include: S.After inspection of the automatic shutoff device, <br /> & tools for removal of the drop tube, reinstall the drop tube. <br /> 0 tape measure; 7.1.7 Pass/Fall Criteria. If the automatic shut- <br /> off device functions as designed and complete <br /> - tools for inspection of the automatic shutoff. <br /> shutoff of product flow is able to occur when the <br /> peLorg <br />
The URL can be used to link to this page
Your browser does not support the video tag.