Laserfiche WebLink
0 0 IW/O#:-I--161-------- <br /> Underground Storage Tank System Designated VST Operator Monthly Inspection Report-Page 2 of 2 <br /> -Nlot Applicable <br /> It EMERGENCY GENERATOR UNBURIED FUEL PIPING VISUAL INSPECTION§25281.5 yesl No IN/Al <br /> 17. Unburied fuel pigin&fittingsubs <br /> ,and containment am free of water.leaks,and hazardows stance. V I <br /> 18. Sensors are caMble of detectis a leak at the earliest ussible oeNt <br /> Comments: <br /> aUu <br /> HEALTH <br /> 7 <br /> Required Follow-Up Actions: <br /> INSTRUCTIONS <br /> I. The monthly UST system inspection must be conducted by a Designated UST Operator who possesses a current"California <br /> UST System rotor"ex issued by the international Code Council(ICC). <br /> 2. The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the monthly visual <br /> inspection that may require follow-up actions. <br /> 3. A copy of this monthly inspection report must be provided to the UST Owner or Operator. <br /> 4. The UST Owner or Operator must maintain a copy of each monthly inspection report and all attachments for the most recent <br /> 12 months.The records shall be maintained on-site or,if approved by the local agency,off-site at a readily available location. <br /> REV.5.0 <br />