Laserfiche WebLink
Be B A 1 DIA. <br />-o <br />Y <br />6 ]6 <br />i 2 ( F) GROUPS <br />OPENINGS TYPICAL j <br />�(2P5 OF FOUR Q <br />2-1/2` AIONIiORING <br />FIT, NG ONE EMI ONLY _-f- - - <br />'CI FT f'FZ <br />g � <br />STRIKE PLATE <br />CENTER ON OPENINGSa v _ 9 I" \ <br />ABOVE (TTP. OF 2) =s � — a <br />'ocR MA rauLRlNa IN <br />taco _ z n w <br />OCO 9 I2 1 F h00_ <br />0 Q Fg C •...910._ <br />�R I 2c0_ <br />_ 2CC � a 3 2 5_444 SJOC-- <br />SIDE <br />EN Ci —IFW <br />Efry RONNENIAE HEAirx WvlSlpx <br />FIBERG(_A' COATED_UOUBLE 9AL <br />�_STETL UNDERGROOND STORAGE TANK SYSTEM IRS fAIL�TION= <br />3w F. vem`a 'In°°Fwor <br />Po eo Jsa loom^, <br />. <br />GA 9s2maaee <br />Phan. -12x91 a6&3a20 <br />Y <br />FIBERGLASS COATED ODUBLe WALL STEEL TANKS PER GTE CAUFORNIA SPECIFICATIONS. <br />"Pt <br />+A K k{} <br />F wln Flag>s 5¢agsmxW <br />JOOR AS FEL' SH'ONN-ALTERNATE ED AL MANUFACTURERS TO BE FABRICATED TYPICAL <br />& APPROVED BY CIL. SPEOfIC <br />SEE SITE PLAY FOR CAPACITY AND QUANTITY OF TAN.1 <br />skBwN <br />LLNQFRGROLNO F"EL S(ORAC TAYK <br />L.' „'fne <br />Ole BY <br />UNLESS OTHERWISE SPECIFIED, TANKS SHALE BE INSTALLED FOUR (4) FEET BELOW FINISHED <br />REQUIRED INTEGRITY TANK (NCO VOIUMEI 1ACUU MG,HCD TO DE PFRFORMF.0 BY fANKNOLOGY <br />- _ _"---�_� <br />ApPnwal of meaB OleM evmMs onymlhm <br />YnRD GRADE. FARKS SHALL BE SET ON A FIRM BASE OF 12' iNICK CLEAN, WASHED, <br />COMPACTED SAND AND SURROUNDED ON ALL SIDES BY A MINIMUM THICKNESS OF 2' OF <br />ORPORATiON CCORDINATC WI H GTE ENV'.HON IAL COMPLIAN:;L <br />CONTACT STAN BRODECKI 0 (909) 613-1553 F.R COS? i0 SET UP TS -,NG AND SCIIEDUUNG <br />or aPDrow mq gnusba <br />CLEAN; "SHED 5AN0. WET INS ROD SAND UNTIL IT IS THOROUGHLY COMPACTED, AFTER <br />IU :--...-'_---_- <br />BaNeU naf rspoYameMsWSlam mYvsa <br />prE^arias. <br />PIPING HAS BEEN INS FAULTS, INSPECTED AND TEEMS, COMPLETE ME BACKFILL NG 1NTH <br />SAND. BACKFILL WILL RF. PLACED IN SIX (6) INCH LAYERS. EACH LAYER CHILL DE <br />m of <br />Hy stn AHBE 1"I <br />�''ll <br />PUDDLED AND TAMPEC TO PREVENT NTURE SETTLEMENT. THE NEED FOR PROPER DACKFILayNryB <br />ANO COMPACTION IS COMPOONDED PATI A DOUBLE WALL TANK AND ALL CONCERNED ARE <br />- -F,wl <br />rl <br />19M3Rx <br />FOREWARNED OF [HIS REQUIREMENT. ALL COMPACTION TO BE 90R <br />tl�f�tygO�l jV7 £(j�;�5_Y$TI-jl Plp Q - <br />^ LOcalOrdngggs <br />CONTRACTOR SHALL AIR PRESSURE TESTALL PRIMARY & SECQNDARY PIPING P91.QA_LQ <br />d CKEILLING OR CONNECTING TO 1 NKSAND GENERATORSISOLATE All C <br />1+ <br />"'ATTYir<-fl-MtN"r'S `r'iS/Li' <br />AFTER TANKS ARE DELIVERED TO SITE, TANK MANUfACiUREq OR SUPPLIER IS <br />RESPONSIBLE FOR PERFORMING ME 35,000 VOLT HOLIDAY TEST AND REPAIR ANY <br />. AP LL <br />Al <br />PRIMARY PIPING RUNS & VRE i0 PS.I. (MIEN.) FOR 30 MINUTES (INSPE <br />OR LONGER REWIRED <br /><3j= - <br />`{Y0 MTrs- <br />HOLIDAYS DISCOVERED. THESE TESTS MUST RE W1TNESSED BY GTE ENVIRONMENTAL <br />AS LOCAL: AGENCY <br />DY LOCAL AGENCY. SOAP [EST All ONiS AND INSPECT FOR (fAKS <br />REPAIR ANY LEAKS DISCOVERED S REWIRED. SECONQARY PIPING TO BE AIR TESTED AFTER <br />�J I All AiNf,c <br />COMPLIANCE AND LOCAL REGULATORY AGENCIES. <br />CONNECTION IN CONTAINMENT SUMP AND IN BU DIN PIPE TRENCH T Pi ._ (M N� TO 5 P. I. <br />(MAX.) FOR 30 MINUTES REQUIRED ".rN- <br />(MIN.) OR LONGER AS BY LOCAI AGENCY, SOA'ES f All 004 Cf <br />AND JOINTS AND INSPECT FOR ILA S REPAIR ANY LEAKS DISCOVERED AS REQUIRED MAIN AIN E <br />CONTRACTOR SHALL PRESSURE TEST TANKS ON THE JOB SITE AFTER SETTING THE TANKS IN <br />. <br />TE <br />AIR ST ON THESECONDARY ONTANMENT P'P,NG DURING ME BACHFIiUNG PROCESS AND VFR.Fi <br />W 111E HOSE, AUT BEFORE BACKFILLING TESTING i0 DE PERFORMCD BEFORE SETTING iHf TANKS <br />IN THE HOLE ONLY IF THE LOCAL. AGENCY MANDATES, BEFORE TESTIN¢. TIGHTEN ALL FITTINGS. <br />THAT NO PRESSURE CROP OCCU 'REO IN THE SECONDARY PIPING, DURING THF dACKFIIA PROCESS. <br />-IG4{EST <br />2� S�>M <br />PRESSURE TESTNG SHALL BE CONE 'M1H EITHERA 10 PSTGADADCALIBRATED <br />WATER ROOD THE SUMPS TG IIGI VEL ABOVE THE PENETRATION AND/OR JOINT TO PIF <br />5APSFACTION OF TNF LOCAL ACE •ICY AND GM ENVIRONMFf.TAL COM - ANCE REPRESENTATIVES. <br />S(1V°}"LJTI <br />FOR PRESSURE RANGING FROM 0-10 R.S.:, OR ELSE A MERCURY MANOMETER GAUGE- A PRESSURE <br />RELIEF SYSTEM SET AT 5 P,S.I. IS iC BE INSTALLED IN THE vEN( CEry)NG OFAl,L TANKS <br />INSPECT FOR LEAKS. REPAIR ANY LEAKS D15GOvtkt D- pF TER 8-4 F", PIPING fiUNS, BOTH <br />PRIMARY AND SECONDARY PIPING SYSTEMS f0 BE RETES?EO PERAFOREMENTIONED PROCEDURES. <br />PRIOR TO PRESSURIZING THE TANKS. PRESSURE TESTING SHALL BE? OGNE'. N IHE FOLLOt41NG <br />SEQUENCF. I PRESSURE TE T FOR 30 MINUTES <br />() U E EST INNER TANK i1 3 P.EI. (MIN) 5 <br />THE TESTING OF TlIE PRIMARY .AND SFCON". PIPING MUST B MT - S D 0: F. ENVIRONMENTAL <br />COMPLIANCE AND LOCAL. AGENT ES. AFTER SUCCESSFUL C' . N J PIPING FII <br />MIN` AN F Y <br />( 0 VERIFY MAY NO PRESSURE DROP IS EXPERIENCED .(2j IF INNER TANK HAS TESTED <br />2) IF INNER <br />SATEFACTIN LY. BLEED PR.ESURE THE INNER TANK INTO THE, ANULAR <br />111E <br />CONTRACTOR 70 PULL BACK iEDUC.NG BOOT FROM SECONDARY Nt PI NG N TANK SUMP 10 AELOW _ <br />CK RU C(UN TAN <br />DR NAGE FROM SC.-CNDARY PIPING SYSTEM in TO LHE (,ONST ANIIY MONITORED <br />UNRETANK <br />L ANNULAR E UNLESS <br />SPA" UNLESS <br />I ME FITTING I ARRANGEMENT R VALVES. DO NOT PRESSORS UNDER <br />INNER TANK IS UNDER PRESSURE. (3) REMOVE TEST. TANKS URE'T PRESSURE SHOULD <br />TANK SUMP. <br />SUMP, <br />NOT RE LETT FLED -10 P O. IF TANK(S)VALE NOT HOLO PRESSURE, TANK MANUFACTURER <br />MUST BE TO PROVIDE REPLACEMENT TANK. -TESTING PROCEDURE MAY VARY WTV <br />ORDINANCES, <br />LOCAL ORDINANCES. <br />NO PRESSURE TEST IS REWIRED BY THE CONTRACTOR IF THE TANK IS DELIVERED TO THE JOB <br />SITE WITH VACUUM [ESL APPLIED BY THE TANK MANUFACTURER, IN PROGRESS. <br />106 <br />