Laserfiche WebLink
REFERENCE NOTES dip <br />®j MODIFIED (E)FUEL OIL PIPING TRANSFER SUMP WITH (E) tE( C 1h <br />DETECTION PROBE. SEE ARCHITECTURAL DI j <br />(E) LEAK DETECTION PROBE SUMP SENSOR (VEEDER ROUT). <br />(E)1-1/2-FOR BEL GROUND TO (E)UNDERGROUND TANK. <br />R <br />® (E)I ios BEL GROUND FR (E)UNDERGROUND TANK. 0 <br />(E)WALL TRANSITION SLEEVE WITH OIICTEO ENTRY BOOT. L �y <br />© DC I'FOS i0 (E)ITOS IN (E)iRANFER SUMP. PROVIDE NPT ETRING <br />ON (E)FOS UNE & COUPLING TO CONN NEW FOS PIPE. Vpy <br />P� 1-1/2-FOR TO (E)1-I/2-FOR IN (E)TRANFER SUMP. PROVIDE F C3 <br />NET FIfiNG ON (E)FOR LINE & COUPLING TO CONN NEW FOR PIPE. ! 2� <br />PRESERVE SLOPE TOWARDS (E) UNDERGROUND FUEL OIL TANK. <br />®8 (E) UNDERGROUND DIESEL FUEL STOWE TANK. <br />NEW 270 GAL UL USTED ABOVE GROUND DIESEL TRANSFER ••••W <br />FUEL/DAY TANK. ALL ALARM SYSTEM WIRING FROM THE DAY TANK $ <br />SHALL BE RUN i0 THE ALARM PANEL LOCATED INSIDE EXISPNG <br />.. .. .. .. VERIZON BUILDING. <br />_< .._,..... ........_...... - ,,,... SOF C DNECTIOGENERATOR,O(SEE FROM (E) UNDERGROUND <br />0 NEWELJECTP� DINGS. <br />II DINT OF CONN 0 i Y <br />DIESEL FUEL STORAGE TANK. EXTEND V. UNE NLN SIZE TO NEW V �! <br />'- PIPE SUPPORT IOCATKIN. SEF AUL RISE <br />12FT AF FOR NEW <br />f SUPPORT LOCATION. V PIPE ENT RISE TO ♦12FT. AFF AND <br />TERMINALE WITH APPROVED VENT CAP. <br />3 <br />FOS .0 <br />1 -4. FOR PPE SUPPORT. SEE DETAIL 2/P FOR <br />PIP0 DETNLFyV <br />I- FOS PIPE AT 60 BOF ABV, FIN. COW. PAD x� <br />2i_ 12'R 8 TRENCH THRU STEEL MET YYY <br />FlPOEID VERIFY 14 1-1/2' FOR PIPE AT 60' BOP ABV. FIN, CONC. Pfd. <br />TRA <br />( <,8 J e� �� `✓,, \111111 2 3 t] MANUFACTURER <br />OREWP UM S DOUBLE ENT PEES DROP TO PPE ■ 40 <br />0At TRENCH METAL COVER, i <br />i 12pK]R�1, i6 M FOS WPNE% PUMPS IN EOUIPMENT ENCLOSURE BY DAY TANK O <br />PUMPS IN EWI%dENi ENCLOSURE BY DAY E <br />TANK MANUFACTURER <br />DUPLER. <br />..'^. '.f.' .. • _16 E4®�OSODOUBLE��PIPE. U <br />/ IRAC PIPE. <br />t <br />L t-1/2'TOS 6 10 DOUBLE TRAC PIPE WALL PENETRATION FIRING F SERIES' <br />FOS <br />Q <br />V UI 15 FOR FOR <br />BOP= VERIFY 21 I-t/2' FOR 10 E) UNDERGROUND STORAGE TANK. <br />aA S p <br />FIEL <br />w <br />T DAY TANK CONTROLLER IN SIDE MOUNTED BOX WITH WEATHERPROOF <br />COT <br />MODIFICATION <br />®WU. <br />BLE iFlt 90' RR1KYi. (M 6 PtACES). <br />I I 8 <br />AREA OF WORK <br />i <br />NORT�n/\T NORTH <br />ISSUE FOR BID 11/19/14 <br />40219.W <br />y/ feq� YY s 11-0]-14 <br />e. M Sutf'➢� fas eeacw <br />-20' 0' 1/4=I' 0" °� wb` ~ 1.gy�WN'A'ed fNK <br />OVERALL - NEW CONDITION 1 PLUMBING PARTIAL PLAN - NEW WORK 2 <br />