Laserfiche WebLink
SWRCB,January 2002 Page d4of`5 <br /> 9. S /OVERFILL CONTAINMENT BO <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specie) <br /> Test Method Used: ❑Pressure ❑Vacuum WIydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: " ; Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: j q <br /> Bucket Depth: off t' st 1010 <br /> Wait time between applying <br /> pressure/vacuum/water and , <br /> starting test: /"� <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 6 ° <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: I <br /> Test Result: ❑ Pass ail ❑ Pass Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Commenis (include information on repaifs made prior to testing, and recommended follow-up for failed tests) <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Atm: Scott Bacon <br /> 1001 "I"Street, Box 944212 <br /> Sacramento,CA 95814 <br /> Phone: (916)341-5873,Fax: (916)341-5808 <br /> e-mail: bacons@cwp.swreb.ca.gov <br />