Laserfiche WebLink
ENVIRONMENTAL HEALTH EPARTMENT <br /> W!" <br /> SAN° SAN JOAQUIN COUNTY <br /> � .oG <br /> Q f V :?� Donna K.Heran,R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue, Third Floor earl Borgman,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> Douglas W.Wilson,R.E.H.S. <br /> oq��FORa�P Program ManagerTelephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> June 13,2005 <br /> Elite IV Contractors,Inc. <br /> 2535 Wigwam Dr. <br /> Stockton CA 95205 <br /> RE: Franks One Stop,2072 W.Yosemite Ave.,Manteca CA <br /> The San Joaquin County Environmental Health Department(SJCEHD)has received the <br /> permit to replace existing spill buckets and install overfill prevention device at the above <br /> referenced location. The permit has been approved with the following conditions: <br /> 1. Contact the local fire department, and the San Joaquin Valley Air Pollution Control <br /> District for applicable permits and requirements. <br /> 2. Any changes in information or scope of work must be submitted to SJCEHD prior to <br /> commencing work. <br /> 3. At least one person who holds the International Code Council"UST <br /> Installer/Retrofitter"certification must be onsite AT ALL TIMES when work is <br /> performed. <br /> 4. A "Certificate of Compliance for Underground Storage Tank Installation Form C" <br /> shall be submitted by the owner or the owners'agent [pursuant to California Code of <br /> Regulation(CCR)2635(d)]before this upgrade will be considered complete by <br /> SJCEHD. <br /> 5. Contact Ray von Flue at(209)468-9848 to arrange the following inspection <br /> appointments; a 48-hour notice for inspection appointments is required. <br /> a. Corrosion protection: prior to backfilling around the spill buckets, corrosion <br /> protection of the risers must be verified. <br /> b. Overfill prevention: overfill prevention system in compliance with CCR 2635 <br /> (b)(2)must be verified. <br /> c. Spill Bucket: after concrete is poured,verify minimum 5-gallon capacity and <br /> conduct a 30-minute lake test in compliance with CCR 2635(b)(1). Proper <br /> drainage must also be verified. <br /> d. Third party tank integrity tests must be performed once concrete is poured, <br /> prior to the contractor signing off of the jobsite. The test results must be <br /> submitted to SJCEHD within 7 days of completing this project. <br /> 6. Permit expires 90 days from the approval date. Note: if an extension to the <br /> expiration date is required,this office prior to the expiration date must receive a <br /> written request. <br /> Thank you, <br /> Raymond von Flue, REHS <br /> San Joaquin County <br /> Environmental Health Department <br />