Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SP OVERFILL CONTA NT BO <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑VacuumHydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: P6 tW6A,6"4L,- Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: / <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): t <br /> Test End Time: / 2 <br /> Final Reading(RF): <br /> Test Duration: / <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Commenis—(include information on re aifs made prior to testing, and recommended follow-up for failed tests) <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Attn: Scott Bacon <br /> 1001 "I" Street,Box 944212 <br /> Sacramento, CA 95814 <br /> Phone:(916)341-5873,Fax: (916)341-5808 <br /> e-mail:bacons@cwp.swrcb.ca.gov <br />