My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_1986-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 11:47:10 AM
Creation date
6/23/2020 6:48:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2007
RECORD_ID
PR0231429
PE
2361
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
01
SITE_LOCATION
1151 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231429_1151 W LOUISE_1986-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ,. <br /> .A <br /> UNDERGROUND TMK.JNSPECTION RECORD <br /> NEW-TANK INSTALLATION <br /> SITE NAME INSPECTOR'S NAME <br /> ADDRESS CITY LIP <br /> CONTRACTORs NAME lip, TELEPHONE 1 <br /> OWNERS NAME TELEPHONE <br /> DIS INSPECTORS <br /> DATE APPROVED APPROVED iNITtALS <br /> IV.10Z <br /> LIEN OR EOl1IlHLNT INSPECTED - <br /> 2. glans apmed <br /> tNtTLAI. INSPECTION <br /> lank t ftliverl lHolidallasteel or air at SPSI PRP <br /> visual n of second&rZ Sontainment. <br /> 1 3. Tank appropriatetv Placed with approved backfill. <br /> A. UL numbers and tank capacities recorded. <br /> • � y <br /> PIPING STAGE INSPECTION <br /> 1. Pressure test of Dipinf. Prtmar nd Secondar NFPA 30 <br /> 1 <br /> 3. Overfill protection Installed. descrihd: <br /> A. Unused tank ogInings scaled and cathodtcellj protected.. <br /> S. Visual inspection of secondary containment oni to . <br /> (lockab}• t.aather proo <br /> !III ring <br /> ® <br /> �r covars <br /> " 7. Fill and vent etping brought to grade. <br /> S. Product line leak detector in Place. Hard wired <br /> F. Approved tank leak manitortna device installed. <br /> Liu. Alt galvanized g1pins and fittloss properly wrtipped. <br /> 1. Pressor* decay Last on Com lete tank and product delivery, s stem`W <br /> 1 FINAL. It.SPF-CTION <br /> ( 1.• Precision test successfully ..0 tete9 ae.d hoed `o41e4 cr4:elvedc��� <br /> 7. S ill protection at (ill pi -e. <br /> ]. Performance test of Overfill ill ut ere it'll ::rse Co. <br /> 4- Per(4.cwaeerr te;a of 1et4dnrt tine lte.ek detectot. (Hard wired) <br /> 0AA- } t Lard <br /> a 5. Performance te:4t of 4:•+1,11nuuu:: w4paie4•11140' x•ser0(s) on tank(..^.P�•4^11 <br /> 6. Pet wit to o errate &PP I tcat ion 4 410 plete. <br /> 1. Acceptable ecordkee in s item. <br />
The URL can be used to link to this page
Your browser does not support the video tag.