Laserfiche WebLink
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION/CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans: <br /> GENERAL <br /> 6�— I Provide the name and address of the facility. <br /> 2. Provide the name, address, and phone numbers of the contractor(s) , facility <br /> owner(s), and operator(s). <br /> 3. Provide four complete sets of plans. (One to be retained by this office). <br /> include specification sheets, equipment brochures, monitoring, and response <br /> plans. <br /> 4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> 1 . Location(s) and number of tanks. <br /> 2. Type of tank(s) to be installed. <br /> A. Steel clad with fiberglass reinforced plastic. <br /> 1 . 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br /> in ground. <br /> Fiberglass <br /> 1 . Striker plate dimensions andmaterials. <br /> 2. Striker plates under all accessible openings., <br /> C. -Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ). <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required). <br /> D. Other types of tanks <br /> 1 . Construction specification �Wstan7rds for durability. <br /> Tank Capacity (List specific gallonage) , 4. <br /> (a� Lqntents to be stored in each tank (Be specific). <br /> Verification of product compatability with the tank(s), piping, monitorintj <br /> device(s) ,(10i0or silicone glues, etc. <br /> 1 . List testing organiiation and approval . <br /> A2- 5'.') "Provide manufacturers written installation instructions. (Include ll piping, <br /> tanks, etc. ) <br /> Note -;,!NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is required on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note NFPA 329 "Precision Test" required upon completion of installations. <br /> One test result copy to be sent directly to this department from the <br /> testing company. <br /> 0 0 <br />