My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_1986-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 11:47:10 AM
Creation date
6/23/2020 6:48:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2007
RECORD_ID
PR0231429
PE
2361
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
01
SITE_LOCATION
1151 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231429_1151 W LOUISE_1986-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br /> OPTION IB <br /> ARTICLE 3, SECTION 2632 <br /> MONTTORTNG <br /> 1 . Manual a and visual monitoring program for motor vehicle fuel tanks only. <br /> 2. Electronic monitors (Article 3, Section 2632(c) (2A,2C)). <br /> A. Connected to audible/visual alarm(s) <br /> B. Type of detector <br /> 1 . Brand Name GLVk <br /> 2. Model number <br /> 3. Sensor type: <br /> a. Vapor <br /> b. Liquid ) a <br /> c. Both <br /> 4. en <br /> sor specification: <br /> a. Detection limits <br /> b. Zero out capabilities <br /> c- System capable of annual testing <br /> Brochures provided <br /> . Manufacturer's written installation instructions provided. <br /> 3.(rwritten' response <br /> ify type of monitoring system (Article;3, Section 2632(d) 1 , 2, 2A, 2B <br /> Written monitoring plan provided ) <br /> plan provided <br /> 4. Hard wiring of electronic monitoring system is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.