My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_1986-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 11:47:10 AM
Creation date
6/23/2020 6:48:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2007
RECORD_ID
PR0231429
PE
2361
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
01
SITE_LOCATION
1151 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231429_1151 W LOUISE_1986-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar 06 07 01:26p <br />Elite <br />Iv Contractors Inc 209 6342 <br />p.1 <br />TANKS <br />UNDERGROUND STORAGE TANKS - INSTALLATI <br />_ <br />,,,) <br />3 3 <br />CERTIFICATE OF COMPLIANCE <br />1 j� <br />(rne Page per tan&) <br />P.7_t <br />L FACILNY IDEMAFiCATION <br />BUSDtE..S NAME FA NAME <br />ItDDRFSSI�gcof <br />1XI/ <br />//7 T7& <br />TAA�K ID • <br />L Ii1NSTAUATtON <br />{Cllr a�Mat ePWY1 <br />The insZailier has been traded and by the tank and piling manufacturers. <br />The insWation has been inspected and certlied by a registered professional engineer having education and <br />mpenence with underground storage tank "insWations_ <br />The irtsWation has been inspected and approved by the UnTed Program Agency_ <br />AN worts fisted on the manuPachuWs has been completed_ <br />The nstaier has been cerbfied or 5censed by the ContractW State Loense Boarm <br />�V The underground storage Sank, any Primary pgmg, and sewulary containment was "instged according to <br />/ appiicable vok maty consensus standards and wriften m s irts1alatiDn procedures. Description of <br />wot8 being certified: <br />7 c/ -�fa <br />HLT K Q ... tRuaGE1 rr siGNATuF <br />SICMTURE OF TAW CW&R^1 Eff <br />/ DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.