Laserfiche WebLink
E <br />jull 0 20V <br />(Submit minimum of 3 sets of plans& applications as originals will be H`EALTH <br />1. Site map enclosed? YES [ I NO[] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other LIST equipment, or performing tank top upgrade, use the LIST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Remove and rep1ace-jQ0 0 <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />(1) OPW 1 C-21 OOC-DEVR <br />EH230038 (revised 12-11-15) <br />