Laserfiche WebLink
Monitoring System Certification" <br />UST Monitoring Site Plan <br />Site Address: QUICK SHOP 2072 W YOSEMITE AVE MANTECA CA 95337 ' 1 <br />71 <br />v <br />. . . . '. . '. . . . . . . . . . . '. . . . '. . .:87 <br />' O O ;87 SPHYON <br />v <br />KEY O O <br />A = ANNULAR <br />' ' ' ' ' ' ' ' ' ' ' ' ' <br />F = FILL <br />. . . . . . . . . . . . . . . <br />V = VAPOR <br />P = PROBE <br />P O <br />T = TURBINE <br />' ' ' ' ' ' ' . ' ' ' ' ' ' ' <br />A <br />O <br />X = SENSOR • • • • • • • • • I . . . <br />........................ <br />................. <br />X.............. <br />O................. <br />O. . . . . . . . . . . . <br />4 AIRPORT WAY __♦ <br />Date map was drawn: 3-27-2015 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 <br />2/21/07 <br />