Laserfiche WebLink
L' <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />C <br />Site Address: QUICK SHOP 2072 W YOSEMITE AVE MANTECA CA 95337 <br />KEY <br />A = ANNULAR <br />F = FILLS <br />T = TURBINE <br />P = PROBE _ <br />VAPOR <br />X = SUMP SENSOR <br />L = PLLD <br />M = Manway <br />B = Brine Sensor <br />I = Smart Sensor <br />S = STP <br />C = Floats & Chains <br />I l '....... I .................................... I ....... <br />I <br />........... ....................... ... I ......... <br />L(Dj. <br />.. ..91 .............. <br />............................................................ <br />..................... .................... ........... I....... <br />- '—' - - - <br />4— AIRPORT WAY ®♦ <br />Date map was drawn: 3-27-2015 <br />Instruction <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />