Laserfiche WebLink
1 0 6 <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: QUICK SHOP 2072 W YOSEMITE AVE MANTECA CA 95337 <br />u <br />. . . . '. . '. . . . '. . . . . .:87' O O :87 SPHYON' . . . . <br />Y <br />w <br />z <br />w <br />t <br />UV ri v <br />4 AIRPORT WAY <br />Date map was drawn: 3-27-2015 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 <br />2/21/07 <br />