Laserfiche WebLink
s <br />n <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />C <br />Site Address: QUICK SHOP 2072 W YOSEMITE AVE MANTECA CA 95337 <br />KEY <br />A = ANNULAR <br />F = FILLS <br />T = TURBINE <br />P = PROBE <br />V = VAPOR <br />X = SUMP SENSOR <br />L = Leak Detector <br />M = Manway <br />B = Brine Sensor <br />I = Smart Sensor <br />S=STP <br />C = Floats & Chains <br />E = E Stop <br />lU" <br />. . . . . . . . . . . . . I �L ) � - � . . . . . . . . . . . . . . . . . . . . . <br />4 AIRPORT WAY ®� <br />Date map was drawn: 3-31-2017 <br />Instruction <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />