Laserfiche WebLink
6 6 <br />a. A valid, current contractor's license issued by the Contractors State License Board, <br />and <br />b. A valid, current UST Installation/Retrofitting certificate issued by the International <br />Code Council (ICC), and <br />c. A valid, current certificate of training from the manufacturer(s) of the component(s) <br />being installed. <br />6. Log into the California Environmental Reporting System (CERS) within 30 days. <br />Complete and submit a "UST Certification of Installation/Modification" form for any piping <br />installed. <br />7. All components must be certified by an independent testing organization and labeled as <br />required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br />Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br />8. Permit expires 180 days from the date of approval. If an extension to the expiration date <br />is required, a written request must be submitted to this office prior to the expiration date. <br />If you have any further questions, please contact Garrett Backus at (209) 468-2986. <br />Thank you, <br />Garrett Backus, REHS <br />Lead Senior Registered Environmental Health Specialist <br />Page 2 of 2 <br />