My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2022 2:00:32 PM
Creation date
6/23/2020 6:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017
RECORD_ID
PR0231429
PE
2361
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
01
SITE_LOCATION
1151 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231429_1151 W LOUISE_2017.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer C!Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> 728" <br /> DC#1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDC Manufacturer: tal Containment Total Containment Total Containment Total Containment <br /> UDC Material: ly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth: 31" 32" 35" <br /> Height from UDC Bottom to Top 12" 15" 14" 14" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 7" 10" 7" 8" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested' Water Line 17" Water Line 18" Water Level 16" Water Level 16" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown?* <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 9:00 9:05 9:40 9:45 <br /> Initial Reading RI): .001 .001 .001 .001 <br /> Test End Time: 9:30 9:35 10:10 10:15 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Yes Yes Yes Yes <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 3 a <br /> 0 2017 <br /> r.wwRQNMENTAL HEALTH <br /> FTENT <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to anv of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.